A villa in Springs 5 — a 12-month project. Not a refresh but a full rebuild of the house inside and out: a new layout, all-new MEP, ceilings 40 cm higher, new windows and doors, a renovated facade and a garden we created together with the owner.
The project at a glance
- Duration: 12 months
- Layout: partitions removed, living space extended
- MEP: air-conditioning, ducting and plumbing fully replaced, AC drainage rebuilt
- Ceilings: raised by 40 cm
- Windows and doors: all replaced
- Facade: fully renovated
- Garden: landscaping together with the owner
A new layout: more light and space
We took the partitions down and reworked the layout — the living space grew and opened onto the garden. The living room and kitchen are now one zone, and from the hall you see greenery through the glass doors. The kitchen is built on an IKEA system.



Ceilings 40 cm higher
To make the house taller, we removed the old suspended ceilings and moved the ducting and indoor AC units closer to the slab. The new frame went up at the new height — raising the ceilings by 40 cm — with slot diffusers and linear lighting built straight in. With the units sitting higher, we rebuilt the AC drainage: electric pumps now lift the condensate above the level of the drip tray, where gravity alone would no longer carry it away.





MEP — all new
Air-conditioning, ducting and plumbing were replaced in full, not patched. Old services were opened up to the base, new pipes and mixers went into the walls, and the showers got linear drains.




Bathrooms: vanities from our own production
We made the vanities ourselves: veneer cabinets with quartz tops — our own production. Wall-hung sanitaryware and backlit mirrors tie the bathrooms into one style.



Floors and a built-in wardrobe
The new floor tiles were laid over the old ones, without demolition. When the base is solid, this saves time and budget and spares the house a week of dust and noise.
The built-in wardrobe uses an IKEA system, fitted to the niche we prepared during the layout change.


Windows, doors and facade
We replaced every window and door, including large sliding glass doors to the garden downstairs. Except one: the client chose to keep the carved front door — it’s beautiful and retro — so we restored it. The facade was fully renovated: the old layer removed, the surface levelled and repainted.





The garden — together with the owner
We did the landscaping together with the owner himself. He loved being part of the renovation and spent almost every day on site with the team — many garden decisions were made right there.



What we took from this project
- Ceiling height is decided by MEP. An extra 40 cm is only possible if the AC, ducting and drainage are redesigned together with the ceiling.
- Not everything has to come out. Tiling over the old floor is an honest saving when the base is solid.